ROOF DRIP SIDE FINISH MOULDING > INSTALLATION |
for Preparation Click here
- HINT:
- Use the same procedures for the RH side and LH side.
- The procedures listed below are for the LH side.
- When replacing the clip, heat the clip and body using a heat light.
- Standard:
Item Temperature Vehicle body 40 to 60°C (104 to 140°F) Clip 20 to 30°C (68 to 86°F)
- NOTICE:
- Do not heat the clip and vehicle body excessively.
1. REPLACE ROOF DRIP SIDE FINISH MOULDING CLIP |
- HINT:
- Use the procedures below to replace damaged or accidentally removed clips. If this step is not necessary, go to the next step.
- NOTICE:
- After press-fitting the clips, wait 30 minutes or more before installing the moulding.
- HINT:
- Minimum hardening time: 30 minutes
- Time needed for complete hardening: 24 hours
Remove the double-sided tape that remains on the surfaces of the moulding and vehicle body, and then clean the surface with white gasoline.
Using a heat light, heat the clip installation surface of the vehicle body and installation part of the clips.
2. INSTALL ROOF DRIP SIDE FINISH MOULDING LH |
Install the No. 2 center roof drip side finish moulding and roof drip side finish moulding.
Install the 2 roof drip moulding joint covers to the vehicle body.