GENERATOR > INSTALLATION |
for Preparation Click here
1. INSTALL GENERATOR ASSEMBLY |
Install the generator assembly with the 2 bolts.
- Torque:
- 52 N*m{ 530 kgf*cm , 38 ft.*lbf }
Install the wire harness clamp bracket to the generator assembly with the bolt.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Connect the wire harness to terminal B with the nut.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
Close the terminal cap.
Connect the generator assembly connector.
2. INSTALL V-RIBBED BELT |
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).